--- H-1 FREEWAY ---

1) HONOLULU ()

24-hour shoulder closure on the H-1 Freeway in the westbound direction between the Pali Highway overpass and the Middle Street underpass on Friday, May 24, through Friday, May 31, for guardrail and shoulder improvements.

2) HONOLULU ()

24-hour shoulder closure on the H-1 Freeway in the eastbound direction in the vicinity of the Liliha Street overpass on Friday, May 24, through Friday, May 31, for guardrail and shoulder improvements.

--- KAMEHAMEHA HIGHWAY (ROUTES 80/83/99) ---

1) WAHIAWA (WEEKEND WORK)
Alternating lane closure on Kamehameha Highway in both directions between Avocado Street and Wilikina Drive at the Wilson Bridge on Saturday, May 25, from 5:30 a.m. to 11:30 a.m., for bridge maintenance work.

--- NIMITZ HIGHWAY (ROUTE 92) ---

1) HONOLULU (WEEKEND WORK)

Right lane closure on Nimitz Highway in the westbound direction betweenon Saturday, May 25, from 6 a.m. to 11 a.m., for electrical maintenance work.

--- PALI HIGHWAY (ROUTE 61) ---

1) NUUANU TO KANEOHE (WEEKEND AND WEEKLY CLOSURE)
Closure of the Pali Highway (Route 61) in both directions between Waokanaka Street and Kamehameha Highway on Saturday, May 25, through Friday, May 31, over a 24-hour period, for slope stabilization work following the landslide. The Kailua-bound lanes will be temporarily open during the schedule below.

From Tuesday, May 28, through Friday, May 31 (contraflow will be closed on Monday, May 27, for Memorial Day):

  • Honolulu-bound traffic will be contraflowed in the Kailua-bound lanes between Saint Stephen’s Diocesan Center and Nuuanu Pali Drive from 5 a.m. and 9 a.m.
  • The Kailua-bound direction will be open from 3 p.m. to 7 p.m.

--- KUALAKAI PARKWAY ---

1) KAPOLEI (WEEKEND WORK)

Intermittent lane closures on Kualakai Parkway in both directions between the H-1 Freeway and Kapolei Parkway on Saturday, May 25, from 5 a.m. to 1:30 p.m., for maintenance work

--- WAIALAE AVENUE ---

1) KAHALA ()

Lane closure on Waialae Avenue in both directions between 21st Avenue and Kilauea Avenue on Saturday, May 25, from 6:30 a.m. to 12 p.m., for maintenance work.

--- MIDDLE STREET ---

1) KALIHI (SIDEWALK AND BIKE PATH CLOSURE)

The west shared use walkway and bike path are closed on Middle Street between North King Street and Kamehameha Highway on Friday night, May 24, through Friday night, May 31, over a 24-hour period, for the Middle Street pavement reconstruction project. Pedestrians are directed to use the east sidewalk.