OAHU LANE CLOSURES

FOR THE WEEKEND OF APRIL 5 – APRIL 7

PLEASE NOTE:

Lane closure schedules may change at any time without further notice.  
All projects are weather permitting.

--- H-1 FREEWAY ---

1) HONOLULU (24-HOUR WORK)

24-hour shoulder closure on the H-1 Freeway in the westbound direction between the Pali Highway overpass and the Houghtailing Street underpass on Friday, April 5, through Friday, April 12, for guardrail and shoulder improvements.

2) HONOLULU (24-HOUR WORK)

24-hour shoulder closure on the H-1 Freeway in the eastbound direction in the vicinity of the Liliha Street overpass on Friday, April 5, through Friday, April 12, for guardrail and shoulder improvements.

3) HONOLULU (WEEKEND/NIGHT WORK)
Two right lanes closed on the H-1 Freeway in both directions on Sunday night, April 7, through Friday morning, April 12, from 9 p.m. to 4 a.m., for guardrail and shoulder improvements. The School Street onramp to the H-1 Freeway westbound will be closed during this time. Motorists will be detoured via Palama Street and Vineyard Boulevard.

Lane closures in the westbound direction are between Vineyard Boulevard offramp (Exit 22) and the Liliha Street overpass.

Lane closures in the eastbound direction are between the Palama Street overpass and the Liliha Street overpass.

4) HONOLULU (WEEKEND WORK)

Alternating lane closure on the Airport offramp (Exit 16) from the westbound H-1 Freeway on Saturday, April 6, from 5:30 a.m. to 11 a.m., for bridge maintenance.

5) WAIMALU TO AIEA (WEEKEND WORK)

Shoulder closure on the H-1 Freeway in the eastbound direction between the Pearlridge/Waimalu offramp (Exit 10) and the Aiea Heights Drive overpass on Saturday, April 6, from 6 a.m. to 7 p.m., for shoulder widening work.

6) WAIPAHU (WEEKEND WORK) 
Left lane closure on the H-1 Freeway in the eastbound direction in the vicinity of the Managers Drive overpass on Saturday night, April 6, from 6 a.m. to 11 a.m., for maintenance work.

--- FARRINGTON HIGHWAY (ROUTES 93/930) ---

1) MAKAHA (WEEKEND/NIGHT WORK)

Closure of Farrington Highway (Route 93) in both directions between Upena Street and Kili Drive at Makaha Bridge #3 on Saturday night, April 6, through Sunday morning, April 7, from 9 p.m. to 6 a.m., for bridge repairs. Motorists will be detoured in both directions via Makaha Valley Road, Ala Holo Loop, Huipu Drive, and Kili Drive.

--- KALANIANAOLE HIGHWAY (ROUTES 61/72) ---

1) AINA HAINA (WEEKEND/NIGHT WORK)

Alternating lane closure on Kalanianaole Highway (Route 72) in the westbound direction between West Hind Drive and Ainakoa Avenue on Sunday night, April 7, through Friday morning, April 12, from 8:30 p.m. to 3:30 a.m., for striping work.

2) WAIMANALO (WEEKEND WORK)

Roving right lane and shoulder closure on Kalanianaole Highway (Route 72) in the eastbound direction between Kanapuu Drive and Flamingo Street on Saturday, April 6, from 7 a.m. to 12:30 p.m., for maintenance work.  

--- KAMEHAMEHA HIGHWAY (ROUTES 80/83/99) ---

1) SALT LAKE (WEEKEND CLOSURE)

Right lane closure on Kamehameha Highway (Route 99) in the eastbound direction between Salt Lake Boulevard and Ford Island on Saturday, April 6, from 5 a.m. to 10 a.m., for the Ford Island Bridge run.

--- NIMITZ HIGHWAY (ROUTE 92) ---

1) HONOLULU (WEEKEND/NIGHT WORK)

Alternating lane closure on Nimitz Highway in both directions between Rodgers Boulevard and Lagoon Drive on Friday, April 5, through Saturday, April 6, from 9 p.m. to 4 a.m., for maintenance work. 

--- PALI HIGHWAY (ROUTE 61) ---

1) NUUANU TO KANEOHE (WEEKEND AND WEEKLY CLOSURE)

Closure of the Pali Highway (Route 61) in both directions between Waokanaka Street and Kamehameha Highway on Saturday, April 6, through Sunday, April 7 over a 24-hour period, for slope stabilization work following the landslide.

--- KALAELOA BOULEVARD ---

1) KAPOLEI (WEEKEND/NIGHT WORK)

Lane closure on Kalaeloa Boulevard in the northbound direction between Kapolei Parkway and Farrington Highway on Sunday night, April 7, through Friday morning, April 12, from 8 p.m. to 4:30 a.m., for the Kapolei Interchange Complex Phase 2 project.Motorists wanting to access the westbound H-1 Freeway will be detoured via Kapolei Parkway, Kamokila Boulevard, and Wakea Street to the Farrington Highway onramp.